Are Solar Panels Worth It for Farms and Agricultural Buildings?

Solar panels can be particularly well suited to farms and agricultural buildings because many sites have large areas of usable roof space and significant daytime electricity demand. Barns, workshops, machinery stores, poultry buildings, dairy facilities, cold stores and other agricultural buildings can potentially provide space for a substantial solar PV system.

However, a large roof does not automatically mean a large solar installation will be worthwhile. The roof structure and condition, electricity consumption, three-phase or single-phase supply, shading, DNO requirements, export capacity and how electricity is used across the site all need to be assessed first.

For farms and agricultural businesses across Surrey, West Sussex, Kent and the wider South East, this guide explains:

  1. Why farms can be well suited to solar PV
  2. Which agricultural buildings can potentially have solar panels
  3. Why daytime electricity use matters
  4. Whether a farm needs three-phase electricity for solar
  5. Why the roof structure needs checking
  6. How asbestos and older roofing can affect a project
  7. How shading and roof orientation affect generation
  8. What happens to surplus solar electricity
  9. Whether battery storage can help
  10. Why DNO approval can be particularly important
  11. How solar systems should be sized for agricultural sites
  12. What should be checked before installation

Why can farms be particularly suitable for solar panels?

One of the biggest advantages many agricultural sites have is space.

A farm may have several barns, workshops, stores and other buildings with considerably more roof area than a typical home.

That can create the potential for a much larger solar array.

More importantly, many agricultural businesses use significant amounts of electricity during daylight hours. Where solar generation coincides with machinery, refrigeration, ventilation, pumping or other electrical loads, a proportion of the electricity can potentially be used directly on site.

That can reduce the amount of electricity being imported from the grid while the solar system is generating.


Which agricultural buildings can have solar panels?

Solar PV can potentially be installed on many types of agricultural building, subject to the building and roof being suitable.

Examples can include:

  • agricultural barns
  • machinery stores
  • workshops
  • grain stores
  • livestock buildings
  • poultry buildings
  • dairy buildings
  • packing and processing buildings
  • cold-storage buildings
  • farm offices

The fact that a building has a large roof does not automatically make it suitable.

The roof construction, condition, loading capacity, orientation, shading and proposed mounting system all need to be considered before solar panels are installed.


Does a farm need to use lots of electricity for solar to be worthwhile?

Electricity consumption is an important part of the design.

A farm that consumes substantial electricity throughout the day may be able to use a large proportion of its solar generation directly.

Another agricultural site might have a huge barn roof but relatively little electrical demand during daylight hours.

Those two sites should not automatically receive the same solar system simply because they have similar roof space.

At JPEC Green Energy, the aim is to design solar around the site’s energy requirements rather than simply covering every available section of roof with panels.

Understanding when electricity is used can therefore be just as important as knowing the annual consumption.


Why is daytime electricity consumption useful for solar?

Solar panels generate electricity during daylight hours.

If the farm is consuming electricity at the same time, some of the solar electricity can be used directly by the site.

Depending on the agricultural business, daytime electrical loads could include:

  • refrigeration
  • cold storage
  • ventilation
  • water pumps
  • milking equipment
  • workshop machinery
  • lighting
  • processing equipment
  • office equipment
  • electric vehicle or machinery charging

The exact loads vary enormously between agricultural businesses.

This is why using actual electricity-consumption information gives a much better basis for solar design than simply estimating from the size of the buildings.


Should you put as many solar panels as possible on a farm roof?

Not necessarily.

A large agricultural roof can make it tempting to maximise the number of panels, but the largest possible system is not automatically the best financial or technical design.

If a site generates substantially more electricity than it can use, the surplus needs somewhere to go.

It might be exported to the grid, stored in batteries where appropriate, or the system may need to operate within an agreed export limitation.

The value of electricity used directly on the farm can also be different from the value received for exported electricity.

A properly designed system should therefore consider generation and consumption together.


Do farms need three-phase electricity for solar panels?

Not every solar installation requires a three-phase electricity supply, but three-phase connections are common on agricultural and commercial sites.

Larger electrical equipment and machinery may already operate using three-phase power.

For a larger solar PV installation, the existing supply arrangement is an important part of the electrical design.

The installer needs to establish what supply is present, how the existing distribution system is configured and how the proposed solar generation can be connected safely.

Having three-phase electricity does not mean an unlimited amount of solar generation can automatically be connected.

The local electricity network still needs to be considered.


Why does the DNO matter for agricultural solar?

The Distribution Network Operator, normally shortened to DNO, operates the local electricity distribution network.

When a solar PV system is connected, it has the potential to export electricity back through the site’s connection and onto that network.

For larger solar installations, an application to the DNO may be required before the proposed system can be connected.

The DNO may approve the proposed capacity, specify particular connection requirements or place a limit on the amount of electricity that can be exported.

This can influence the final solar and battery design.

For a substantial agricultural project, network requirements should therefore be investigated early rather than after the panels have already been ordered.


What is an export limitation?

An export limitation controls the maximum amount of electricity that a solar installation can send back to the electricity network.

For example, a farm may have enough roof space for a substantial solar array but the local network may not be able to accept the full potential export from that system.

Depending on the project and DNO requirements, an approved export-limitation arrangement may allow generation to be managed so that export remains within an agreed limit.

This does not necessarily mean all solar generation above that figure is wasted.

If the farm is using electricity at the same time, some generation can be consumed on site rather than exported.

The actual design needs to be agreed for the particular connection and equipment.


Can battery storage help a farm use more solar electricity?

Potentially, yes.

Battery storage can capture some electricity that would otherwise be exported and make it available for use later.

For example, solar panels might produce more electricity than the farm requires during the middle of a bright day.

A battery could potentially store some of that surplus and discharge it when solar generation reduces but the site’s electrical demand remains.

However, a battery should not automatically be added to every agricultural solar installation.

The battery capacity, power output, electricity consumption, tariff, available solar surplus and installation cost all need to make sense for the site.

JPEC Green Energy can consider solar PV and battery storage as one coordinated energy system rather than treating them as unrelated products.


Could a farm charge batteries from the grid as well as solar?

Depending on the battery system and electricity tariff, grid charging may also form part of the energy strategy.

A battery could potentially charge during an appropriate lower-cost electricity period and discharge when grid electricity is more expensive or when the site has higher demand.

For an agricultural business, the value of this depends heavily on the site’s tariff and consumption profile.

A farm operating equipment around the clock will have very different requirements from a site where most electricity is consumed between normal working hours.

Battery storage should therefore be sized using real consumption information wherever possible.


Does the roof need checking before installing solar panels on a barn?

Yes. The roof needs to be suitable for the proposed solar installation.

A structural assessment may be required to establish whether the building can safely accommodate the additional loads associated with the panels and mounting system.

Agricultural buildings vary significantly in age and construction.

Some may have modern steel frames and relatively new roof coverings. Others may be decades old, modified over time or show signs of deterioration.

The condition of fixings, roof sheets, supporting structure and other relevant elements should be considered before installation.

Through JPEC Group, the renewable-energy design can also be coordinated with appropriate building and structural assessment where required.


What if an agricultural roof contains asbestos?

Older agricultural buildings can contain asbestos-containing materials, including certain historic cement roof sheets.

You should never assume an older corrugated roof is asbestos-free simply by looking at it.

If asbestos-containing material is present or suspected, the proposed solar installation needs appropriate professional assessment before work begins.

Solar installers should not simply drill, cut or disturb a suspect roof covering to fit mounting equipment.

Depending on the building, dealing with the roof before installing solar may be the more appropriate long-term solution.

This is particularly important if the roof is already approaching the end of its useful life.


Should an old agricultural roof be replaced before solar is installed?

If a roof is likely to require major work in the near future, it can make sense to address that before installing the solar array.

Solar panels can operate for many years.

Installing them onto a roof that then needs replacing shortly afterwards could mean removing the array, completing the roofing work and reinstalling the equipment.

That creates additional disruption and cost.

For older barns and agricultural buildings, the condition and expected remaining life of the roof should therefore form part of the early project assessment.


Does the direction of a barn roof matter?

Yes, but a roof does not necessarily need to face perfectly south for solar panels to be worthwhile.

South-facing arrays can provide strong annual generation, while east and west-facing roofs can also be useful depending on the site.

An east-facing array tends to generate more electricity earlier in the day, while a west-facing array can provide more generation later in the afternoon.

For a working farm, that generation profile may actually align well with particular electrical loads.

The roof pitch, orientation, shading and available area should therefore be assessed alongside the farm’s consumption pattern.


Can trees or other farm buildings affect solar generation?

Yes. Agricultural sites can have significant shading from trees, silos, grain stores, neighbouring barns and other structures.

Shading can change throughout the day and across different seasons.

A roof that appears completely clear at midday in summer may experience very different conditions during a winter morning or afternoon.

A solar survey should therefore consider the likely effect of shading rather than relying only on a quick visual inspection.

Modern system design and suitable equipment can help manage some shading conditions, but good design starts with understanding where and when shading occurs.


Can solar panels power farm machinery?

Solar electricity generated on site can contribute towards electrical loads operating on the farm, including suitable electrically powered machinery and equipment.

However, saying that solar panels “power the machinery” can oversimplify how the electrical system works.

The solar installation normally operates alongside the grid supply.

If a machine requires more power than the solar system is generating at that moment, the grid can provide the difference.

If solar generation exceeds the site’s demand, the surplus may charge a battery or be exported, depending on the system design.

The power requirements and starting characteristics of larger machinery also need to be considered by the electrical designer.


Can solar panels reduce a farm’s electricity bills?

They can reduce the amount of electricity purchased from the grid when solar generation is available and being used on site.

The financial impact varies considerably between farms.

A business with high daytime electricity consumption may use a significant proportion of its solar generation directly.

Another farm with relatively low daytime demand may export much more electricity.

Electricity tariffs, export arrangements, system cost, generation and ongoing consumption all influence the financial result.

For that reason, JPEC Green Energy does not recommend judging an agricultural solar project from a generic online savings figure.

The numbers should be based on the actual site.


How should a farm solar system be sized?

Agricultural solar should be designed using more than available roof area.

A useful assessment can include:

  • annual electricity consumption
  • half-hourly or other available consumption data
  • daytime and overnight demand
  • seasonal changes in electricity use
  • existing electrical loads
  • future machinery or equipment
  • roof area and orientation
  • roof condition and structural suitability
  • shading
  • existing electrical supply
  • DNO requirements
  • potential export limitations
  • battery-storage options

This information helps determine whether the most appropriate system is a relatively modest array designed around self-consumption or a much larger renewable-energy project.


Why can half-hourly electricity data be useful?

Annual consumption tells you how much electricity a site uses over a year, but it does not tell you when that electricity is being consumed.

For agricultural solar, timing can make a substantial difference.

Half-hourly consumption data can show how the site’s demand rises and falls throughout the day.

This can help identify how closely electricity use is likely to align with solar generation and where battery storage might potentially add value.

For sites with complex loads, JPEC can also consider more detailed electrical monitoring where appropriate rather than designing from assumptions.


What about farms that use more electricity in winter?

Seasonal demand is particularly important.

Solar PV generates electricity throughout the year, but generation is significantly higher during the brighter months than during short winter days.

An agricultural business with its highest electrical demand during summer may therefore have a different solar profile from one whose consumption increases dramatically during winter.

Annual figures can hide this difference.

A proper design should compare expected solar generation with how the agricultural business actually operates across the seasons.

Battery storage can shift electricity between different times of day, but a normal battery does not store large amounts of summer solar generation for use several months later.


Can solar be expanded if the farm uses more electricity in future?

Potentially, but future expansion should be considered when the original system is designed.

A farm might later add electric machinery, vehicle charging, additional refrigeration, new buildings or other significant electrical loads.

Knowing about those plans can influence decisions about the original solar array, inverter arrangement, electrical infrastructure and battery storage.

However, future expansion can also be affected by DNO requirements and available network capacity.

You should therefore not assume that an installation can simply be doubled later without further assessment.


What should happen before solar panels are installed on a farm?

The project should begin with understanding the site rather than choosing panels from a brochure.

JPEC Green Energy can assess the agricultural property’s electricity use, buildings, roofs and electrical infrastructure before producing a system design.

Depending on the project, this can involve coordination between renewable-energy, electrical and building specialists within JPEC Group.

That is particularly useful for larger agricultural projects where roof condition, structural suitability, three-phase distribution, DNO requirements, battery storage and future electrical loads may all affect one another.

The aim is a system designed around the agricultural business as a whole.


JPEC Green Energy can help

JPEC Green Energy designs and installs solar PV and battery-storage systems for agricultural and commercial properties across Surrey, West Sussex, Kent and the wider South East.

For farms and agricultural sites, we can assess available roof space, electricity consumption, electrical infrastructure, predicted solar generation, battery-storage opportunities and DNO requirements before recommending a system.

As part of JPEC Group, we can also coordinate the wider electrical and building considerations that can be important on agricultural projects rather than looking at the solar panels in isolation.

Whether you have a single agricultural building or a larger site with several barns, workshops and significant electrical loads, the system should be measured and designed around how the business actually uses electricity.

To discuss an agricultural solar PV project and arrange an appropriate survey, contact JPEC Green Energy.

This article provides general information and is not site-specific electrical, structural, planning or financial advice. The suitability and performance of an agricultural solar PV installation depend on the buildings, electricity consumption, roof structure, electrical connection, local network and system design. Recommendations should be confirmed through an appropriate survey and professional design.

Get in touch

Get in touch and talk to our helpful, friendly team. Take the first step towards lower energy bills and green energy solutions with JPEC Green Energy.